Before the operation of the diesel generator set, the following routine checks should be done:

11.8

First, appearance inspection:

 

Whether the external engine of the generator set is damaged and complete, whether the screws are tightened, and whether the generator output line and control line are damaged and loose.

 

Ii. Fuel system:

 

1. Whether the amount of diesel is enough, whether there is oil leakage or loose pipe fittings in the distribution pipe, and eliminate the remaining air in the fuel system.

 

2. Lubrication system: Is the engine lubricating oil enough? New engines and overhauled engines must perform the following after the first 50 hours of operation

 

Maintenance:

 

(1) Replace engine oil;

 

(2) Replace the engine oil filter;

 

(3) Replace the engine diesel filter;

 

(4) Check and adjust the valve clearance;

 

(5) Check the engine external screws;

 

Third, cooling system: check whether the cooling radiator water is enough, and add anti-rust agent.

 

Battery: Check whether the electrolyte of the battery is at the normal liquid level, whether the voltage is correct, and the tightness of the joint.

 

Fifth, see whether the generator set charger can operate normally.

 

6. Exhaust system: whether the silencer is damaged and check the firmness of the exhaust pipe installation.

 

7, whether the environment around the generator set is clean, and clean up the flammable materials and debris around.

 

Eight, the generator room ventilation must be maintained.

 

9. No miscellaneous personnel are allowed to enter the generator room.

 

For more questions about the generator set, please call the Beidou Power team. More than ten years of professional production and sales of power generation equipment experience, more professional engineer team to serve you, choose Beidou power is to choose rest assured, welcome on-site factory inspection.