What Are The Characteristics Of Generators?

Must the load carried by the generator maintain a three-phase balance during use? And what exactly does the “two votes and three systems” of the power system refer to?

The maximum deviation of the load carried by the generator shall not exceed 25%, and the lack of phase operation is strictly prohibited.

The second ticket refers to the work ticket and the operation ticket. That is, any work and operation performed on power equipment. Must first receive the work ticket and operation ticket issued by the person in charge of the shift. The parties must act according to the vote. The three systems refer to the shift shift system, patrol inspection system, and regular equipment switching system.

5.12


Post time: May-12-2021