Storage of diesel generator sets for site construction?

Convenient for on-site construction of diesel generator set scientific calculation of the warranty period, to meet the user’s desire to put into use as soon as possible, the normal maintenance of diesel generator set. It is recommended to install and debug the diesel generator set immediately after it arrives at the service site, and arrange full-time personnel to be responsible for the operation and daily maintenance of the diesel generator set.

If the diesel generator set needs to be stored for a period of time for some special reasons, a reasonable and feasible storage scheme should be formulated according to the length of time. The storage of diesel generator sets will have a decisive adverse effect on the diesel engine and the main alternator, and the correct storage method is very necessary.

The storage of diesel generator set in site construction should be carried out according to the steps, including the cleaning of diesel generator set, the drying and ventilation of diesel generator set, the replacement of new lubricating oil of appropriate quality, the coolant in the water tank and the anti-rust treatment of diesel generator set.

The storage location of the diesel generator set should be able to ensure that it is not hit by trees and objects, so as to avoid damage. In addition, it is recommended that users establish independent warehouses and do not place flammable and explosive items around diesel generator sets. Some fire protection measures are necessary, such as placing *BC grade fire extinguishers.

In order to prevent moisture from entering the main alternator coil, greatly reduce moisture condensation, reduce the insulation performance of the generator, and even affect the availability of the diesel generator set, attention should be paid to keeping the environment around the generator dry, or take appropriate heating * devices and other special measures, so that the coil always maintain the necessary dry.

The storage of diesel generator sets should avoid overheating, too cold or rain and sunlight. The starting battery of diesel generator set in site construction is high energy lead-acid battery. It is recommended that users do not add electrolytes before commissioning of diesel generator sets. If added, care should be taken to recharge every 5 to 8 weeks to avoid battery damage or reduced service life. When storing batteries, avoid direct exposure to sunlight or rain.

After storage for a period of time, before installation and use, attention should be paid to check whether the on-site construction diesel generator set is damaged, whether the electrical parts of the diesel generator set are oxidized, whether all connected parts are loose, and whether the main generator coil is kept dry. If necessary, appropriate measures should be taken. The preceding information also applies to the installation of the diesel generator set in the equipment room, which is the basic requirements for the equipment room.

 10.14有


Post time: Oct-14-2022