Inspect the four-leakage phenomenon, surface, starting battery, oil and fuel of the unit;
No load every month, no load time not more than 5 minutes;
Perform full load test of the unit every quarter, and conduct power mutation test;
Replace the three filters according to the operating time of the unit, rather than regularly;
Clean and improve the environment of the computer room, and replace the three filters regularly;
After the unit has replaced parts, overhauled or replaced the three filters, it must be judged by a full-load test machine.
Through the full-load test machine, the nominal power of the unit is corrected, and the actual situation of the unit is known at any time, so that customers can be aware of the safe use of electricity when using the operating unit.
Through the full-load test machine, various performance indicators of the unit are obtained, the real reason for the performance decline of the unit is judged, and a scientific basis is provided for whether to replace the three filters, and the maintenance cost is reduced.
Through the full-load test machine, it can be judged whether the expected goal can be achieved after the overhaul.
Through the full load test machine, the long time full load test can effectively remove the carbon deposits, extend the time of the unit overhaul, and save the cost.
Through the full-load test machine, it provides a basis for the scrapping time of the unit, so that the customer can reasonably arrange the use of the unit.
Preventive experiment is to fundamentally solve the hidden dangers of the unit. It is an important measure to determine whether the equipment can continue to be put into operation and ensure safe operation. It is an important link in the operation and maintenance of power equipment. It is to ensure that users “safety first, prevention Mainly, to reduce costs” necessary measures.
Post time: Aug-24-2021