Primo reprehendo antequam.
I. Reprehendo utrum oleum gradu de oleum scale sit inter L et h ad si sunt aliqua abnormes signa olei qualitas.
II. Reprehendo an refrigerationem aquae in aquam piscinam sufficit, utrum aqua valvae aperitur, utrum frigus aqua abnormes.
III. Reprehendo in tensio de sentinam balteus, fan balteus et disco balteus.
IV. Reprehendo an non est aliqua obstantia inter fan et refrigerationem laminam aquae piscinam et removere si est.
V. Reprehendo utrum sit aliqua obstantia reclinant supra unitas, si est removere.
VI. Reprehendo generantis posuit oleum leakage et aquarum leakage.
VII. Reprehendo utrum altilium iungo is solvere et oxidized.
VIII. Respice ad unitas operatio modulo recordum card, comparare variis odio et oleum extenditur usum.
Secundo, reprehendo post incipiens
I. Confitemini ad generantis posuit non habet aliud sonus, si non habet ad prohibere statim.
II. Reprehendo in oleum pressura MAGE. Sub normalis fortuna, et oleum pressura non esse minus quam 35Psi.
III. Reprehendo utrum frequency et intentione generantis sunt firmum et opus condicionem in patina.
IV. Et super tres condiciones sunt normalis, non-onus calor engine post X minuta, cum onus currentem.
V. Vitare currit ad plus quam LXXX% rated onus diu.
VI. In onus condiciones, audi in Diesel engine nihil sonitus, reprehendo in oleum pressura, aqua temperatus (infra XC gradus Celsius) Frequency, voltage, fumus color.
VII. Reprehendo generantis posuit oleum leakage, aquam leakage, aere lacus et abnormes vibrationis de unitas.
VIII. Reprehendo utrum temperatus de pila testa est alius.
Tertio, reprehendo post shutdown
I. Post unloading onus, in Diesel engine est cessat post X minuta non-onus operationem, ut electrica pila et lubricating partibus Diesel engine sunt plene refrigeratione.
2. Check the unit after the shutdown for oil leakage, water leakage phenomenon, if necessary, but also in 2 hours after the shutdown to let the cooling water cooling water can be discharged, the puddle should have a certain effective volume and height, to facilitate the submersible pump timely and reliable discharge of oil, water, while reducing the amount of fuel in the room, reduce the risk of fire. Submersible sewage pump should be used one standby, and should be self-controlled operation, when conditions, oil and puddle should be located outdoors, it is recommended that the effective volume of oil collection and puddle is 5 to 15 minutes of submersible sewage pump suction.
Post tempus: Jun-17-2024